Farhikhtegan Hospital at SRBIAU near completion in near future , Development Vice President announces

13 May 2012 | 16:31 Code : 3290 News
visits:311
SRBIAU Vice –President for Development and Construction Eng. Mohammad Bagher Shakiba informed that the 320 bed Farhikhegan Hospital construction was completed and the hospital being built adjacent to the SRBIAU campus was ready for commission in the very near future, the Office of Public Relations (OPR) reports

Farhikhtegan Hospital at SRBIAU near completion in near future , Development Vice President announces

                                                                                                                                   

SRBIAU Vice –President for Development and Construction  Eng.  Mohammad Bagher Shakiba informed that the 320 bed Farhikhegan Hospital  construction  was completed and the hospital being built adjacent to the SRBIAU campus was ready for commission in the  very near future, the Office of Public Relations (OPR)   reports.

The hospital built on 9 floors  and 45 000 sq meter area houses a plethora of units specialized in  gynecology , CCU, NICU, surgery , recovery , NSICU, infections, clinical services,  emergency , heart diseases , physiotherapy, dialysis, angiography, nuclear medicine, CT scan , dentistry , radiology etc. It also includes an administration unit ,  kitchen and restaurant, mosque, library , bank, conference hall with a capacity of 530 seats , bank and dormitories for men and women.

 The hospital design won the first award f the Construction Industry Design in the year  1390 ( 2010)